Power line 33 KV Ondo State Olokola

We go where no one has gone before.

Power lines up to 33 KV

ASTAC designs and implements electric power lines up to 33 KV. We deliver complete solutions including substations and also provide maintenance.

ASTAC has already installed several hundreds of kilometres of power lines for the National grid connecting more and more people to the wealth of electricity

Difficult / swampy terrain

ASTAC is specializing in installing power lines in difficult, unpathable and swampy terrain. With our own heavy special equipment we are able to even cross waters and pile up to 40 metres deep to ensure that poles stand strong even in the most difficult terrain. Such, even remote areas can finally be connected to the National grid.

ASTAC Swamp Buggies at work in Niger Delta